By M. H. Lulla
Consultant, Chennai
A 1966 engineering graduate from Annamalai University, he worked for 8 years with a contracting company before setting up practice as an HVAC consultant. Has designed AC systems for a variety of applications. Teaches at the Anna University School of Architecture and is an ISHRAE member.
Look at a not-very-uncommon installation 21 x 7½ ton ceiling suspended ductable split air conditioning units installed for cooling an office space of approximately 20,000 sq. ft. The AC units are spread out evenly, over the conditioned space each cooling a small dedicated area. Chances are that when you visit this office you will be given an umbrella, along with your visitors badge at the reception counter. The umbrella is to keep you dry from the water that drips all over.
Jokes apart the above signifies that wet false ceilings due to condensation are a grim reality. Here is a live case study.
Space under investigation : 30,000 sq. ft. of office space.
Cooling equipment : Multiple ceiling suspended 7/10 ton single skin AHUs connected to a central, rooftop chilled water system. Total capacity of the AHUs exceeds 200 tons.
System layout : The AHUs are distributed in ones and twos all over the conditioned area, chilled water piping with EPS insulation, duly sand cement plastered, connects the AHUs to the pipe risers.
Fresh air intake : Sometimes a hole in the wall near the ceiling hung AHU, some times a common, central, treated FA unit with no control on air entering conditions more often than not the TFA unit is off or at least the chilled water flow through it is stopped.
Problems : The maintenance staff call in a false-ceiling contractor, a painting contractor, virtually, every alternate week end; sometimes it is to clean fungi which has started growing on the underside of the false ceiling, at other times it is to replace the soggy ceiling rendered wet by water on its top side. Everyday, when the system starts there is a musty smell from the wet false ceiling, which stops after the AC system has run for 2 hours.

More details of the office : The office consists of small work zones, within the full area covered by all the AHUs, the zones are clearly partitioned from one another but over the false ceiling the void is generally one large return air plenum with selective placement of return air grilles. Some zones work in the day time, some at night and yet others all the time.
A. In addition to the above a scan with an infra-red thermometer yielded the following results:
Temperature readings in a zone which was not working and its windows had been kept open by the janitorial staff (AHU switched off with no occupants)
B. Apart from the above measurements the following observations were also made:

In closing one cannot stop from going one more step in the thought process of condensation problems and split units. Most design engineers feel that floor space is conserved by using ceiling hung equipment and tend to overlook the fact, that ceiling hung equipment will never get the degree of maintenance which floor mounted equipment will receive. It is not unusual for most AMC (Annual Maintenance Contract) contractors to spend the month before summer time, running a car air washer over the cooling coil of all air handling units / package units. A 300 psi jet of water is invariably run over the cooling coil, for hours on end, to clean them. This annual exercise ensures that summer passes of without putting too much pressure on the maintenance man. This pressure jet cleaning is just not possible with ceiling hung equipment placed over a false ceiling. Hence, split AC units can never be as well maintained as floor mounted equipment. The above is not to be taken as a case for stopping the use of split units but the equipment layout should be looked at carefully. Split units when installed in an AHU room will overcome the above disadvantage and may be considered to be as good as floor mounted equipment, all other points being equal.